Current News

/

ArcaMax

Baltimore bridge collapse reverberates from cars to coal

Nacha Cattan, Heather Perlberg and Brendan Murray, Bloomberg News on

Published in News & Features

The Francis Scott Key Bridge, named for the man who wrote the text of the Star-Spangled Banner, took five years to build and was completed in 1977. The cost at the time was around $141 million, according to one estimate. A rebuild today is likely to cost “several billion dollars,” said Freemark.

President Joe Biden said he wants the federal government to pay and vowed “to move heaven and earth to reopen the port and rebuild the bridge.”

But Baltimore is in for a lengthy reconstruction. It could be weeks before any port operations resume as officials need to recover missing victims, remove bridge debris and the 984-foot Dali from the river and then reopen the blocked channel.

“This is one of the cathedrals of American infrastructure,” said US Transportation Secretary Pete Buttigieg. “The path to normalcy will not be easy, it will not be quick, it will not be inexpensive, but we will rebuild together.”

That’s expected to accelerate a shift of cargo to the West Coast to avoid bottlenecks from Boston to Miami. A sudden 10% to 20% increase in volumes through a port is enough to cause massive backlogs and congestion, according to Ryan Petersen, the founder and chief executive officer of Flexport Inc., a digital freight platform based in San Francisco.

Traversing Maryland, meanwhile, threatens to create headaches for motorists and truckers. A trip from Edgemere heading south to Glen Burnie was about 15 miles (24 kilometers) over the bridge. It’s 20 miles via the Baltimore Harbor Tunnel. The trip will be even tougher for truckers hauling hazardous materials, which are barred from the tunnel. They’d have to travel 45 miles on the Baltimore Beltway.

 

The biggest hit though could be to Baltimore itself, a city of close to 600,000 people whose stagnation and high-poverty neighborhoods were made famous by television show "The Wire."

The bridge helped connect major parts of Baltimore and was key to its renaissance as a logistics and e-commerce hub after the shuttering of its steel industry. With its deep-water port, shortline railway and well-located interstate highway, the city attracted investors who have been pouring money into redevelopment.

One of the largest projects, Tradepoint Atlantic, has leased millions of square feet in warehouse space to some of the world’s biggest businesses, including Amazon.com Inc. and FedEx Corp.

The local president of the International Longshoremen’s Association warned that he has 2,400 ILA members who could soon lose their jobs.

...continued

swipe to next page

©2024 Bloomberg L.P. Visit bloomberg.com. Distributed by Tribune Content Agency, LLC.

Comments

blog comments powered by Disqus